Asbestos Removal
Removing asbestos without risk
We are a recognized asbestos remover and follow a strict procedure for the removal of both bonded and unbonded asbestos-containing materials. We strive for speed and efficiency in our work, with minimal impact on the environment.
Our control systems are designed to prevent any spread of contamination, with techniques such as creating negative pressure areas.
The meticulous adherence to safety regulations, including the correct equipment and safe disposal of asbestos, is paramount for us.
Our Way of Working
For the removal of non-bound asbestos-containing materials from buildings and structures, we never rush the process. Therefore, we always follow these steps:
- Step 1: Situational analysis and drafting the action plan
- Step 2: Creation of a hermetic zone
- Step 3: Install the negative pressure system to prevent spread during the work.
- Step 4: Continuously conduct inspections during the removal to ensure safety and health.
- Step 5: Clearance of the area
Our teams are always well-equipped, trained, and work according to strict safety regulations. The disposal of asbestos-containing materials is also carried out in compliance with the applicable legislation.
Realisations asbestverwijdering
Demolition of Sacred Heart Hospital Roeselare
Client: RSL Construct (JV Coussée and ION) Location: Roeselare Execution period: Start early 2023 – completion in Q2 2025
Demolition Works Meir Corner
Demolishing the old Proximus buildings on the Meir, the busiest shopping street in Antwerp? Talk about a challenge! During this project, we are taking into account numerous safety measures, dust reduction, great height, and the lack of space to literally tear the place down. Fortunately, we could rely on our latest addition, a Volvo crawler excavator with a demolition boom of no less than 36(!) meters. Let's go! More about this project