Remediation
Our way of working is as follows:
- Preliminary investigation: A thorough analysis and risk assessment to determine the extent and nature of the contamination.
- Remediation plan: Based on the preliminary investigation, a remediation plan is drawn up, taking into account local environmental legislation and the specific requirements of the site.
- Execution: The contaminated soil is excavated.
- Processing of contaminated soil: The processing techniques of biological or physicochemical cleaning take place at our own processing facilities, Top-Mix and Top-Mix Recycling. For other processing techniques (thermal cleaning and landfill), you can always contact us.
- Monitoring: During and after the remediation, the site is monitored to ensure the effectiveness of the remediation and to ensure that no residual contamination remains.
- Reconstruction: After the remediation, the site can be restored with the aim of returning it to its original state or preparing it for new developments.
Certificate: Achilles protocol
Realisations saneringswerken
New South - Antwerp
Total project. Verhelst Aannemingen, part of Verhelst Group, is responsible for the earthworks, sewerage, roadworks, and landscaping for the construction of the entirely new district 'Nieuw Zuid' in Antwerp, commissioned by Attis/Triple Living. The works will proceed in different phases until 2028. Nieuw Zuid covers an area of 18 ha and will comprise 2000 residential units, along with schools, daycares, a sports hall, a student complex, and 10 residential towers of 24 floors (80m high). In total, 10km of sewerage will be laid and there is earthmoving including building pits of 1,000,000m³.
Sanering Gipsberg - Oostende
Inkapseling van een voormalig gipsstort te Oostende over een oppervlakte van 15 ha door Verhelst Aannemingen, onderdeel van Verhelst Group.
Sanering Brownfield Tupperware - Aalst
Sloop van de vroegere Tupperware gebouwen aan de P. Corneliskaai. Bij het bouwklaar maken van de site, stond Verhelst Aannemingen, onderdeel van Verhelst Group, ook in voor de wegeniswerken. Hierbij werd maximaal ingezet op hergebruik van de afbraakmaterialen tot grondstof voor de wegenaanleg.