Curious about a sample of what we can do? Here you'll find some impressive projects that the teams at the Verhelst Group have enthusiastically worked on over the past months. From demolition and earthworks to infrastructure works, and from sand extraction to asphalt production. The result is always worth it! And this is just a selection of our many projects, not nearly everything!
Blasting Container Crane Zeebrugge
Container crane (Noell crane 8) was successfully dismantled in the port of Zeebrugge using dynamite by Verhelst Aannemingen, part of the Verhelst Group.
Demolition of the Middelkerke casino
After the dismantling, the actual demolition of the Middelkerke casino began on March 6, 2018, by Verhelst Aannemingen, part of the Verhelst Group, with an official press moment.
Rialto Oostende
Careful dismantling and demolition of the Ciné Rialto in the heart of Ostend by Verhelst Aannemingen, part of Verhelst Group, with as little disturbance as possible to adjacent buildings and residents.
Junction Melle/Ghent/Merelbeke
Sewer and infrastructure works on Mellestraat (Melle), Merelbekestationsplein and Bloemstraat (Ghent) and Theaterstraat (Merelbeke), carried out by Verhelst Aannemingen, part of Verhelst Group, according to schedule in 10 months' time. Due to the high chance of bombs from WWII, work was done under the supervision of bomb experts. During the works, a WWII bunker was uncovered.
Demolition of KV Oostende Stadium
In preparation for the construction of the current modern stadium of KV Oostende, Verhelst Aannemingen, part of Verhelst Group, carried out the demolition work on the main stand of the then Albertparkstadion.
Demolition of buildings Kouter - Ghent
Meticulous partial demolition of buildings while preserving the façade in an urban environment by Verhelst Aannemingen, part of the Verhelst Group.